
RESOURCES
Real projects, real results — see how Plasson products perform in the field.
Irrigation
Renewing a 1988 irrigation system with a full Plasson polyethylene network built to outlast the one it replaced.
Read case studyIrrigation
A course-wide irrigation upgrade that cut water usage by 20% and returned the course to play six weeks ahead of schedule.
Read case studyWater Infrastructure
A live 355mm tap into an active wastewater main, avoiding a full shutdown on Rolleston’s critical pipeline.
Read case studyMining
Plasson PRVs replaced short-lived metal valves in a hyper-saline underground mine, eliminating downtime entirely.
Read case studyWater Infrastructure
Electrofusion saddles let repairs happen without draining a 123km critical water pipeline.
Read case studyNo case studies in this category yet.