IRRIGATION | ROYAL SYDNEY GOLF CLUB
The trusted connection behind Royal Sydney’s upgrade.
Royal Sydney Golf Club’s eastern-suburbs course underwent a major redevelopment, and the irrigation network had to be modernised without shutting the course down. The project team worked to a tight construction schedule, through coastal, saline soil, and with restricted access across a live golf course — all while upsizing pipe diameter from 63mm to 90mm to support the new design.
Superintendent Adam Marchant and irrigation contractor Gosford Irrigation needed a system that was cost-effective, low-maintenance, and built to last — one that could also deliver a genuine environmental win. The finished system cut water usage by 20% and returned the course to play six weeks ahead of schedule.
No metal parts in the water path, for a genuinely low-maintenance system.
Mechanical fittings cut installation labour by roughly six weeks.
Plassaddle connections reduced installation time and labour costs across the project.
PN16-rated products, independently certified to Australian Standards.
A fully welded PE100 system with a 100-year design life.
Around 73 million litres saved every year.
A narrow construction window left little room for delay.
Restricted working space made equipment coordination difficult while parts of the course stayed open to members.
Saline, sandy ground caused galling and corrosion issues for conventional metal fittings.
Anti-seize compound requirements and hardware lost in trenches slowed installers and caused rework.
Pipe diameter needed to increase to support expanded irrigation zones and shorten turf closures.
High member expectations across a full course redevelopment meant only reliable, efficient components would do.
Superintendent Adam Marchant said the redevelopment demanded components that could hold up to a tight build schedule and difficult coastal conditions. He credited Plasson’s bolt-free mechanical saddles and electrofusion fittings with keeping the installation on schedule without compromising on quality, and pointed to the training and on-site support the Plasson team provided throughout the project.
“We only work with products we believe in” — and Plasson gave the club confidence in a solution that matched the calibre of the course.
Adam Marchant — Superintendent, Royal Sydney Golf Club
90–450mm PE100 pipe joined with SmartFuse fittings, backed by on-site training for the installation crew.
Full-bore, quarter-turn valves that reduce head loss and cut pumping costs across the network.
Over 1,800 bolt-free mechanical saddles installed, shaving roughly six weeks off the construction schedule.
Training, supply, and responsive on-site support for the installation team from start to finish.
Download the complete PDF for the full technical breakdown and project timeline.